Please see some of the latest contracts Baypoint has been working on:
‘Wightlink Ferry Terminals’ – Lymington and Yarmouth
In October 2007 and August 2008 we undertook Topographical Surveys of both terminals resp.
‘Cardiff Marina’ – Cardiff Bay
Baypoint Surveys were commissioned to work with a Marine Piling contractor to install the piles required to stabilise to new marina pontoons. Using our Trimble S6 long range lasers we were able to set out the individual pile to within a very high degree of accuracy.
‘Gospel Oak to Barking Rail Link’ – London
Our PTS certified surveyors surveyed eight ‘Rail over Road’ Bridges along this line for Atkins Rail. The track surveys were undertaken during night time possessions whilst the road could be surveyed during the day. Each bridge survey was tied to national grid and datum using GPS rovers.
‘Gloucester Quays’ – Gloucester
Our Site Engineers were responsible for setting out the steelwork for the shop fronts, car-ramp and management suite.
‘Westfield’ – White City, London
Baypoint Surveys undertook numerous Engineering Surveys of the new structure during construction to ensure the installation of the cladding steelwork was installed within the client’s tolerances.
Portfolio
Please see some of the latest contracts Baypoint has been working on:
‘Wightlink Ferry Terminals’ – Lymington and Yarmouth
In October 2007 and August 2008 we undertook Topographical Surveys of both terminals resp.
‘Cardiff Marina’ – Cardiff Bay
Baypoint Surveys were commissioned to work with a Marine Piling contractor to install the piles required to stabilise to new marina pontoons. Using our Trimble S6 long range lasers we were able to set out the individual pile to within a very high degree of accuracy.
‘Gospel Oak to Barking Rail Link’ – London
Our PTS certified surveyors surveyed eight ‘Rail over Road’ Bridges along this line for Atkins Rail. The track surveys were undertaken during night time possessions whilst the road could be surveyed during the day. Each bridge survey was tied to national grid and datum using GPS rovers.
‘Gloucester Quays’ – Gloucester
Our Site Engineers were responsible for setting out the steelwork for the shop fronts, car-ramp and management suite.
‘Westfield’ – White City, London
Baypoint Surveys undertook numerous Engineering Surveys of the new structure during construction to ensure the installation of the cladding steelwork was installed within the client’s tolerances.